QUICK LINKS: GO Network Status | GO Arrivals/Departures | VIA Rail Arrivals/Departures | TTC Trip Planner (Unofficial)

GO Transit Kitchener/Guelph expansion EA completed

By shost at 12:38 pm on Tuesday, July 21, 2009

Thanks to David Graham, who recieved his letter this morning, which states the GO Transit EA Study for service expansion to Kitchener/Guelph/etc has been completed. The completed study can be viewed in person at the following locations

  • City of Brampton – Clerks office – 2 Wellington St West, Brampton
  • Town of Halton Hills – Clerk’s Office – 1 Halton Hills Drive, Georgetown
  • Halton Hills Public Library – Acton Branch – 17 River Street, Acton
  • Guelph City Hall – Clerk’s Office – 1 Carden Street, Guelph
  • Guelph Public Library – Main Branch – 100 Norfolk Street, Guelph
  • Region of Waterloo Library – Bloomingdale Branch – 860 Sawmill Road, Bloomingdale
  • Kitchener Public Library – Main Branch – 85 Queen Street North, Kitchener
  • Kitchener City Hall – Clerk’s Office – 200 King Street West, Kitchener
  • Region of Waterloo Library – New Hamburg Branch – 145 Huron Street, New Hamburg
  • Region of Waterloo Library – Baden Branch – 115 Snyder’s Road East, Baden
  • Township of Wilmot – Clerk’s Office – 60 Snyder’s Road West, Baden
  • Township of Woolwich – Clerk’s Office – 24 Church Street West, Elmira

More details to come, as well, watch your local newspaper for their take.  The completed study is in a public review period until September 7 2009.

Filed under: Uncategorized4 Comments »

4 Comments

1
Get your own gravatar for comments by visiting gravatar.com

Comment by Tom West

July 21, 2009 @ 3:29 pm

Any chnace of an online version appearign somewhere?

2
Get your own gravatar for comments by visiting gravatar.com

Comment by Frank

July 21, 2009 @ 11:44 pm

The letter I got also said that a copy of the Environmental Study Report is available at http://www.gotransit.com under the “projects and studies” tab. But the website doesn’t have such a tab, can anybody find a link to study?

3
Get your own gravatar for comments by visiting gravatar.com

Comment by shost

July 22, 2009 @ 9:44 pm

The report is found here:

http://www.gotransit.com/PUBLIC/en/news/ea/environmental_study_reports.htm

4
Get your own gravatar for comments by visiting gravatar.com

Comment by Brendan

July 23, 2009 @ 10:06 pm

Interesting how the report says “…minimal track work is required for opening day service…”

So much for the rail line being in bad condition I guess, unless I missed something

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.